SAE AIR 6364 : 2017

SAE AIR 6364 : 2017

TEST FACILITY SHAKEDOWN AND COMMISSIONING

SAE International

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$46.80

$78.00

(price reduced by 40 %)

Table of Contents

1. SCOPE
2. REFERENCES
3. PHASE 1 - OFF SITE (FACTORY) EQUIPMENT
   COMMISSIONING CHECKS
4. PHASE 2 - ON SITE STATIC EQUIPMENT COMMISSIONING
   CHECKS (NO ENGINE RUNNING)
5. PHASE 3 - ON SITE DYNAMIC EQUIPMENT CHECKS (INCLUDES
   ENGINE RUNNING)
6. NOTES

Abstract

Gives guidance and recommendations to future or existing users of turbofan, turbojet, and turboshaft/turboprop gas turbine engine test facilities regarding commissioning readiness of new, modified, or re-located facilities.

General Product Information

Document Type Standard
Status Current
Publisher SAE International
Committee EG-1E

Contact us

Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

New products

  •    >>
  •    >>
  •    >>
  •    >>
  •    >>

All new products

Specials

All specials