IEEE 1185 : 2010

IEEE 1185 : 2010

RECOMMENDED PRACTICE FOR CABLE INSTALLATION IN GENERATING STATIONS AND INDUSTRIAL FACILITIES

Institute of Electrical & Electronics Engineers

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$35.10

$78.00

(price reduced by 55 %)

Table of Contents

1. Overview
2. Normative references
3. Definitions, acronyms, and abbreviations
4. Cable pulling recommendations
5. Raceway cable fill recommendations
6. Cable installation recommendations
7. Conduit-cable pulling charts
8. Cable pulling attachment methods
9. Pull rope and tape selection
10. Cable lubrication
11. Tension-limiting methods
12. Cable pullbys and pushbys
13. Pullbacks
14. Installation of specialty cables
15. Installation of armored cable
16. Duct bank cable pulls
17. Vertical cable support
18. Acceptance testing of installed cables
Annex A (normative) - Conduit-cable pulling charts
Annex B (informative) - Use of conduit-cable pulling
        chart examples
Annex C (informative) - Conduit-cable pulling chart
        methodology
Annex D (informative) - Conduit-cable pulling chart
        bend correction factor
Annex E (informative) - Glossary
Annex F (informative) - Bibliography

Abstract

Covers guidance for wire and cable installation practices in generating stations and industrial facilities.

General Product Information

Document Type Standard
Status Current
Publisher Institute of Electrical & Electronics Engineers

Contact us

Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

New products

  •    >>
  •    >>
  •    >>
  •    >>
  •    >>

All new products

Specials

All specials