IEEE C62.82.1 : 2010

IEEE C62.82.1 : 2010

INSULATION COORDINATION - DEFINITIONS, PRINCIPLES, AND RULES

Institute of Electrical & Electronics Engineers

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$35.10

$78.00

(price reduced by 55 %)

Table of Contents

1. Overview
   1.1 Scope
   1.2 Purpose
   1.3 Applications
2. Normative references
3. Definitions
4. Principles of insulation coordination
   4.1 General outline of the insulation coordination
       procedure
   4.2 Determination of the system voltage stress
   4.3 Comparison of overvoltages with insulation strength
   4.4 Selection of standard insulation levels
   4.5 Low-frequency, short-duration withstand voltages
   4.6 Standard BIL and BSL
   4.7 Classes of maximum system voltage
   4.8 Selection of the equipment standard insulation level
Annex A (informative) - Bibliography

Abstract

Covers three-phase alternating current (ac) systems above 15 kV. Defines the procedure for selection of withstand voltages [basic lightning impulse insulation level (BIL) and basic switching impulse insulation level (BSL)] for equipment phase-to-ground and phase-to-phase insulation systems.

General Product Information

Document Type Standard
Status Current
Publisher Institute of Electrical & Electronics Engineers
Supersedes
  • IEEE 1313.1 : 1996

Contact us

Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

New products

  •    >>
  •    >>
  •    >>
  •    >>
  •    >>

All new products

Specials

All specials