IEEE C57.93 : 2007
IEEE C57.93 : 2007
INSTALLATION AND MAINTENANCE OF LIQUID-IMMERSED POWER TRANSFORMERS
Institute of Electrical & Electronics Engineers
INSTALLATION AND MAINTENANCE OF LIQUID-IMMERSED POWER TRANSFORMERS
Institute of Electrical & Electronics Engineers
1 Scope
2 Normative references
3 Liquid-immersed power transformers rated 501 kVA to 10 MVA,
or with primary windings less than 69 kV
3.1 General
3.2 Inspection and receipt
3.3 Internal inspection
3.4 Handling
3.5 Assembly
3.6 Storage
3.7 Tests
3.8 Energization
3.9 Maintenance
4 Liquid-immersed power transformers rated 10 MVA and above or
with high-voltage windings 69 kV and above
4.1 General
4.2 Shipping
4.3 Inspection and receipt
4.4 Internal inspection
4.5 Handling
4.6 Anchorage
4.7 Assembly
4.8 Vacuum treatment
4.9 Field drying of insulation
4.10 Reprocessing
4.11 Tests after the transformer has been assembled and
filled with dielectric liquid
4.12 Energization
4.13 Maintenance
4.14 Storage guidelines
Annex A (informative) Bibliography
Annex B (informative) Figures and table
Annex C (informative) Field equipment for oil-filling EHV
transformers and determination of insulation dryness
Presents recommendations applying to the shipping, handling, inspection, installation, and maintenance of liquid-immersed power transformers rated 501 kVA and above with secondary voltages of 1000 V and above. It covers the entire range of power transformers, including extra high-voltage (EHV) transformers.
Document Type | Standard |
Status | Current |
Publisher | Institute of Electrical & Electronics Engineers |
Supersedes |
|