IEEE C57.19.00 : 2004
IEEE C57.19.00 : 2004
GENERAL REQUIREMENTS AND TEST PROCEDURE FOR POWER APPARATUS BUSHINGS
Institute of Electrical & Electronics Engineers
GENERAL REQUIREMENTS AND TEST PROCEDURE FOR POWER APPARATUS BUSHINGS
Institute of Electrical & Electronics Engineers
1 Overview
1.1 Scope
1.2 Purpose
2 References
3 Definitions
4 Service conditions
4.1 Usual service conditions
4.2 Unusual service conditions
5 Rating
5.1 Rated maximum line-to-ground voltage
5.2 Rated frequency
5.3 Rated dielectric strength
5.4 Rated continuous current
6 General requirements
6.1 Electrical requirements
6.2 Physical requirements
6.3 Thermal requirements
6.4 Nameplate markings
7 Test procedure
7.1 Test conditions
7.2 Design tests
7.3 Special tests
7.4 Routine tests
Pertains to power apparatus bushings that have basic impulse insulation levels of 110 kV and above for use as components of oil-filled transformers and oil-filled reactors.
Document Type | Standard |
Status | Current |
Publisher | Institute of Electrical & Electronics Engineers |
Supersedes |
|