IEEE 1267 : 1999

IEEE 1267 : 1999

TRIAL-USE GUIDE FOR DEVELOPMENT OF SPECIFICATIONS FOR TURNKEY SUBSTATION PROJECTS

Institute of Electrical & Electronics Engineers

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$35.10

$78.00

(price reduced by 55 %)

Table of Contents

1 Overview
      1.1 Scope
      1.2 Purpose
      1.3 Contractor qualification/certification
      1.4 Site data
      1.5 Equipment and service furnished by the Purchaser
      1.6 Special tools furnished by the turnkey Character
      1.7 Purchaser terms and conditions
2 References
3 General requirements
      3.1 General description
      3.2 Optional additional equipment and services by
             the Contractor
      3.3 Miscellaneous equipment and services by the
             Contractor
      3.4 Proposal data by the Contractor
      3.5 Other considerations
Annex A (informative) Design considerations
Annex B (informative) Bibliography

Abstract

Defines technical requirements to design, fabricate, engineer, specify, furnish, test, install, manufacture, commission and provide as-built documents for air-insulated substations. The Purchaser is responsible for the project information and data for use by the Contractor in the proposal. If either party supplies technical data, that party is responsible for the data accuracy.

General Product Information

Document Type Standard
Status Current
Publisher Institute of Electrical & Electronics Engineers
Supersedes
  • IEEE DRAFT 1267 : D8-2 JAN 99

Contact us

Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

New products

  •    >>
  •    >>
  •    >>
  •    >>
  •    >>

All new products

Specials

All specials