1 Overview
1.1 Scope
1.2 Purpose
1.3 Contractor qualification/certification
1.4 Site data
1.5 Equipment and service furnished by the Purchaser
1.6 Special tools furnished by the turnkey Character
1.7 Purchaser terms and conditions
2 References
3 General requirements
3.1 General description
3.2 Optional additional equipment and services by
the Contractor
3.3 Miscellaneous equipment and services by the
Contractor
3.4 Proposal data by the Contractor
3.5 Other considerations
Annex A (informative) Design considerations
Annex B (informative) Bibliography
Defines technical requirements to design, fabricate, engineer, specify, furnish, test, install, manufacture, commission and provide as-built documents for air-insulated substations. The Purchaser is responsible for the project information and data for use by the Contractor in the proposal. If either party supplies technical data, that party is responsible for the data accuracy.