IEEE 1025 : 1993
IEEE 1025 : 1993
GUIDE TO THE ASSEMBLY AND ERECTION OF CONCRETE POLE STRUCTURES
Institute of Electrical & Electronics Engineers
GUIDE TO THE ASSEMBLY AND ERECTION OF CONCRETE POLE STRUCTURES
Institute of Electrical & Electronics Engineers
1 Overview
1.1 Scope
1.2 Purpose
1.3 Application
1.4 Safety
1.5 Legal disclaimer
2 References
3 Definitions
4 Structural design considerations
4.1 Construction and maintenance loads
4.2 Material delivery
4.3 Constructibility of concrete pole structures
4.4 Helicopter construction
5 Material delivery
5.1 Material yard
5.2 Receipt and inspection of material
5.3 Handling and storage of material
5.4 Overages, shortages, and replacement material
5.5 Surplus material
6 Assembly and erection of concrete pole structures
6.1 Handling and transportation of poles, arms, and
component parts
6.2 Single pole structures
6.3 Frame structures
6.4 Helicopter erection
6.5 Attaching pole structures to various foundations
6.6 Post-erection
7 Assembly and installation of insulators and
hardware
7.1 Assembly of insulators and hardware
7.2 Installation of cotter keys
7.3 Installation of assemblies
8 Quality assurance
9 Bibliography
Covers sundry methods of good practice to improve ability to assemble and erect self-supporting and guyed concrete pole structures, also covers construction aspects after foundation installation up to conductor stringing operation.
Document Type | Standard |
Status | Current |
Publisher | Institute of Electrical & Electronics Engineers |
Supersedes |
|