Sets out general conditions of contract for the supply of equipment which is purpose-built or manufactured, including equipment such as building elements. Where equipment is being supplied for use at different times or stages, separable portions may be appropriate. If installation is required, AS 4910-2002 for supply of equipment with installation, should be used.